Improvement model to reduce internal lead time trough SLP, slotting and MRP in a metalworking plant (#996)
Read ArticleDate of Conference
July 15-17, 2026
Published In
"Engineering without Borders: Artificial Intelligence, Knowledge, Innovation, and Alliances for a Future from the Americas"
Location of Conference
Santiago (Chile)
Authors
Peña Castañeda, Kiara Alelí
Oscco Villar, Joel Boris
Cabrera Gil Grados, Ezilda Maria
Abstract
This research was conducted in a micro-enterprise (MSME) in the metalworking sector, which, like other similar companies, faces logistical problems in its warehouse management. In this case, the Internal Lead Time (ILT) of the order preparation process was 4.74 hours, impacting the achievement of the internal customer service level and causing delays in the timely supply of materials to the production area. The diagnosis revealed unnecessary travel distances and disorganized storage of supplies as the root cause, associated with a layout that does not favor material flow, as well as frequent stockouts due to poor planning. An improvement model was proposed that integrates Systematic Planning (SLP), Slotting, and Material Requirements Planning (MRP). SLP reduces internal travel time, Slotting reduces search time on shelves, and MRP reduces stockouts. The Arena simulation, modeled with data from a pilot project, validates that the ILT was reduced by 18.6%, thus validating the effectiveness of the proposed model.