|
ANÁLISIS DEL IMPACTO DEL LEAD TIME EN LOS COSTOS TOTALES Y EL NIVEL DE SERVICIO PARA UNA CADENA DE SUMINISTRO CON DIFERENTES ESTRUCTURAS DE PRODUCTOS Y HORIZONTE RODANTE DE PLANIFICACIÓN |
Published in: | Innovation in Education and Inclusion : Proceedings of the 16th LACCEI International Multi-Conference for Engineering, Education and Technology | |
Date of Conference: | July 18-20, 2018 |
Location of Conference: | Lima, Perú |
Authors: |
Rafael Merlano (Corporación Universitaria del Caribe -CECAR, CO)
Jairo Coronado (Universidad Tecnológica de Bolívar, CO)
|
Full Paper: | #45 |
|
Abstract:The main objective of the research is to evaluate the impact of lead time on the system of costs and performance of the service level, for multi-level CSM. The production system is planned and optimized on the rolling horizon, using the GMOP mathematical model, based on the concept of Stroke and Skus. With the results of the simulation, an analysis of variance is carried out, and interaction of the input factors on the response variables of the system.
|