This article shows the simulation of the production line assembly 032 pen, using queuing theory. Area and assembly process is described, information production times and stop times for each machine area are collected. The model is developed in two stages: 1) The production model and 2) the model of stop times, with these two models production times and total production for each shift are calculated. The results obtained by the model are similar to current production levels, besides these results also allow us to calculate the efficiency of each machine and all the assembly area. The main objective is to project production using the simulation model. You can simulate operating scenarios with limited resources.
Resumen:El presente articulo muestra la simulación de la producción de la línea de ensamble del boligrafo 032, usando teroria de colas. Se describe el área y proceso de ensamble, se recopila información de los tiempos de producción y los tiempos de parada para cada máquina del área. Se desarrolla el modelo de dos etapas: 1) El modelo de producción y 2) El modelo de tiempos de parada; con estos dos modelos, se calculan los tiempos de producción efectivo y las producciones totales para cada turno. Los resultados obtenidos por el modelo son similares a los niveles de producción actuales; ademas estos resultados tambien nos permiten calcular la eficiencia de cada máquina y de toda el area de ensamble. El objetivo principal es poder proyectar la producción usando la simulación del modelo. Se puede simular escenarios de operación y calcular proyecciones con recursos limitados.
|